Terravek GRIDSCAN
Corridor inspection without the helicopter bill.
GRIDSCAN inspects linear infrastructure corridors — electricity transmission and distribution, rail, pipeline — detecting vegetation encroachment, structural defects and third-party interference from remotely sensed data.
A utility with 14,000 km of overhead line cannot walk it. GRIDSCAN turns corridor inspection into a scheduled data product: fly or task the corridor, and receive a ranked list of clearance breaches, leaning structures, missing hardware and encroaching vegetation with a confidence score and a location accurate to better than 15 cm.
The vegetation model predicts growth forward as well as measuring it now, so a maintenance team can be dispatched to the spans that will breach clearance in eleven weeks rather than the spans that breached last month.
For rail, GRIDSCAN adds cess vegetation, structure gauge intrusion and earthworks movement, developed with the Cardinal Grid team in Bristol and assured to CSM-RA.
Capabilities
Clearance analysis
Conductor-to-vegetation and conductor-to-ground distances against your own clearance standard.
Growth forecasting
Species-aware growth models project breach dates 6–36 months forward.
Structure condition
Detects lean, missing insulator caps, damaged cross-arms and bird nesting.
Third-party interference
Flags new excavation, stockpiling and structures within the easement.
Defect exchange
Open GRIDSCAN schemas export directly into common asset management systems.
Rail module
Cess vegetation, structure gauge and earthworks movement, CSM-RA assured.
Editions
| Edition | Description |
|---|---|
| GRIDSCAN Power | Transmission and distribution overhead line corridors. |
| GRIDSCAN Rail | Rail corridors, including cess and earthworks. UK/IE assurance package available. |
| GRIDSCAN Pipeline | Buried and above-ground pipeline easements, including encroachment and subsidence. |
Specifications
| Specification | Value |
|---|---|
| Positional accuracy | ≤ 0.15 m horizontal, ≤ 0.20 m vertical (LiDAR source) |
| Minimum detectable clearance change | 0.25 m |
| Corridor throughput | Up to 3,000 km per delivery cycle |
| Defect classes | 38 (power), 22 (rail), 17 (pipeline) |
| Export formats | GRIDSCAN JSON Schema, Esri File Geodatabase, GeoPackage, CSV |
| Typical cycle | Quarterly, or annual with storm-triggered re-tasking |
Limitations
We state these on the product page rather than in a footnote during procurement. The sales cycle is eleven months and the truth surfaces anyway.
- Growth forecasting requires at least two prior survey cycles before predictions are issued.
- Conductor detection under dense evergreen canopy degrades; those spans are flagged as low-confidence rather than reported as clear.
- The rail assurance package is currently scoped to UK and Irish infrastructure managers only.
Customers using GRIDSCAN
Caledonian Rail Infrastructure
Cess vegetation survey across 1,240 route km without possession
Read case study →Energy & utilities · 2023Stadtwerke Oberpfalz
Ten years of vegetation management on 4,800 km of distribution network
Read case study →Energy & utilities · 2025Front Range Electric Cooperative
Wildfire-season fuel load mapping across 9,100 km of line
Read case study →