The four sites Terravek operates that are not staffed offices: a ground station, a calibration range and two colocation facilities.

Ground segment node · site code SVG-GS

Svalgrund Ground Station

Two 7.3 m X-band antennas (SVG-A1, SVG-A2) plus S-band TT&C. Unstaffed; operated remotely from Toulouse mission ops (room Cassini 4.22). Site contact via noc@terravek.com.

Svalgrund, Norrbotten County, Sweden · commissioned 30 September 2024 · unstaffed

Radiometric & geometric calibration range · site code VHP-CAL

Vollenhove Polder Calibration Range

Permanent reflector array and 42 in-situ FIELDKIT nodes used for sensor cross-calibration. Field campaigns run March, June and September.

Vollenhove Polder, Overijssel, Netherlands · commissioned 12 May 2014 · 4 staff

Primary data centre (colocation) · site code AMS4

Amsterdam AMS4 colocation

Cage AMS4-C12, racks C12-01 through C12-14. Production ORBIS Cloud region eu-nl-1. Managed by IT Infrastructure.

Amsterdam Science Park, Netherlands · commissioned 11 January 2016 · unstaffed

Secondary data centre / DR (colocation) · site code FRA2

Frankfurt FRA2 colocation

Cage FRA2-B07, racks B07-01 through B07-06. ORBIS Cloud region eu-de-1, warm standby and offsite backup target.

Frankfurt am Main, Germany · commissioned 22 July 2019 · unstaffed

Svalgrund Ground Station

X-band antenna SVG-A1 at Svalgrund Ground Station
Antenna SVG-A1 during commissioning, September 2024.

Terravek's own X-band downlink node in Norrbotten County, Sweden, entered service on 30 September 2024. It is unstaffed and operated remotely from the Cassini mission operations room (4.22) at the Toulouse office.

The site's purpose is not a lower median delivery latency but a tighter distribution: a station Terravek controls removes contention for priority passes, which is what determines the worst case for customers running alerting services. The reasoning at the time and the commissioning account.

Antennas
2 × 7.3 m X-band (SVG-A1, SVG-A2), plus S-band TT&C
Operations
Remote, from Toulouse — room Cassini (4.22)
Staffing
Unstaffed; maintenance visits quarterly
Connectivity
Diverse fibre pair
Commissioned
30 September 2024
Operational contact
noc@terravek.com