Zeeland Water Board · Water management & flood risk

Storm-surge early warning for 340 km of coastal defence

The Zeeland Water Board needed surge warnings earlier than tide-gauge networks alone could provide, across a defence system too large to instrument densely.

Illustration for the Zeeland Water Board programme

The challenge

Zeeland's defence system spans 340 km of primary and secondary flood defences protecting roughly 380,000 people. The board's existing tide-gauge network gave excellent point measurements and nothing in between. Dyke condition was surveyed on a six-year cycle by levelling, which is accurate, slow and expensive.

What we did

Terravek deployed 46 FIELDKIT 400-M tide and pressure nodes along the defence line and combined them with TIDEWATCH satellite-derived shoreline and dune volume monitoring, and an ORBIS persistent-scatterer interferometry stack for settlement. Threshold alerts are issued to the board's duty officer within 25 minutes of downlink.

Results

  • Surge warnings issued on average 3.5 hours earlier than the previous process
  • Dyke settlement now monitored continuously at 2 mm/year sensitivity, replacing the six-year levelling cycle for screening purposes
  • Dune volume assessed after every named storm rather than annually
  • Awarded the 2025 Geospatial Impact Award for Coastal Resilience

We have not replaced our engineers' judgement. We have given them a picture of the whole system between surveys instead of four points and an assumption.

Programme Manager, Zeeland Water Board