Customer portal System status Developers Contact Search
Case studies

Customer case studies

10 programmes, published with the customer's agreement.

Every case study on this page has been reviewed and approved by the customer named in it. Where a figure is quoted, it is the customer's figure or a jointly agreed one.

Water management & flood risk · NL · 2025

Zeeland Water Board

Storm-surge early warning for 340 km of coastal defence

The Zeeland Water Board needed surge warnings earlier than tide-gauge networks alone could provide, across a defence system too large to instrument densely.

Read case study →
Ports & maritime · NL · 2024

Rijnmond Port Authority

Prioritising €18M of annual dredging on trend, not schedule

Rijnmond dredges continuously. The question was never whether to dredge but where the sediment had actually gone since the last survey.

Read case study →
Rail & transport · GB · 2024

Caledonian Rail Infrastructure

Cess vegetation survey across 1,240 route km without possession

Vegetation management on the network was reactive, expensive and required track access that competed with renewals.

Read case study →
Energy & utilities · DE · 2023

Stadtwerke Oberpfalz

Ten years of vegetation management on 4,800 km of distribution network

Terravek's longest-running GRIDSCAN deployment, and the dataset that made growth forecasting possible.

Read case study →
Agriculture · FR · 2023

Coopérative Agricole du Lauragais

Variable-rate nitrogen across 1,900 member fields

The cooperative asked whether a hyperspectral research model could run at production scale. It could, after two seasons of validation.

Read case study →
Energy & utilities · US · 2025

Front Range Electric Cooperative

Wildfire-season fuel load mapping across 9,100 km of line

A cooperative in wildfire country needed to know where its network crossed the highest fuel loads before the season, not after an ignition.

Read case study →
Agriculture · KE · 2025

Nakuru County Agriculture Directorate

Smallholder advisory reaching 41,000 farmers by SMS

The delivery mechanism was the hard part. The agronomy was well understood; getting it to a 0.4 hectare plot in a form a farmer would act on was not.

Read case study →
Government & urban planning · NL · 2022

Provincie Zuid-Holland

Thirteen years of annual land-use and building change detection

Terravek's second-oldest continuous customer relationship, running annually since 2012.

Read case study →
Forestry · EE · 2024

Baltic Forestry Group AS

Stand inventory and windthrow response across 260,000 hectares

After the 2023 storms, the question was how much timber was down and where — within days, not weeks.

Read case study →
Insurance & risk · AT · 2023

Alpenland Versicherung AG

Portfolio flood exposure and post-event damage assessment

An insurer with alpine flood and hail exposure needed a defensible, repeatable damage picture within days of an event.

Read case study →

Download all ten as a single PDF (44 pages).